|
Chairman |
Secretary |
| ADVISORY GROUPS | |||
| Ref | Title | Convener | Duration |
| SAG B5 | Strategic Advisory Group | J. Amantegui (ES) | Permanent |
| AG B5-51 | Substation Automation and Remote Control | J.M. Ordacgi Filho (BR) | Permanent |
| AG B5-52 | Protection and Monitoring of Main Plants and Transmission Circuits | S. Chano (CA) | Permanent |
| AG B5-53 | Monitoring, Metering, Recording and Overall Power System Protection | R Adams (UK) | Permanent |
| AG B5.54 | Tutorial | I. De Mesmaeker (CH) | Permanent |
| Working Groups - Task Forces | |||
| Ref | Title | Convener | Dates (Creation - Disbanding) |
| WG B5-04 | Modern Techniques for Protecting and Monitoring Generating Plants | G. Benmouyal (CA) | 2005 - 2008 |
| WG B5-05 | Modern Techniques for Protecting, Controlling and Monitoring of Power Transformers | M. S. Sachdev (CA) | 2002 - 2007? |
| WG B5-06 | Maintenance Strategies for Digital Substation Automation Systems | V. Leitloff (FR) | 2007 - 200? |
| WG B5-07 | Modern Techniques for Protecting and Monitoring of Transmission Lines | S. Chano (CA) | 2004 - 2007 |
| WG B5-08 | Refusbishment strategies based on Total Cost of Ownership, Operational Risks and Technical Contraints | P. Leushuis (NL) | 2004 - 2007 |
| WG B5-12 | Engineering Guidelines for IEC 61850 Based Digital Substation Automation Systems | J. Castellanos (ES) | 2007 - 200? |
| WG B5-14 | Wide Area Protection and Control Technologies | Vladimir Terzija | |
| WG B5-16 | Modern Techniques for Protecting Busbars in HV Networks | Z. Gajic (SE) | 2003 - 2007 |
| WG B5-23 | Short circuit protection of circuits with mixed conductor technologies in transmission networks | Luc Uyttersprot (BE) | |
| WG B5-24 | Protection Requirements on Transient Response of Voltage and Current Digital Acquisition Chain | Janez Zakonjsek, (RU) | |
| WG B5-27 | Implications and Benefits of Standardised Protection Schemes | Alex Apostolov (US) | |
| WG B5-31 | Management of Protection Relay Settings | P. Crossley (UK) | 2006 - 2009 |
| WG B5-36 | Applications for Protection Schemes based on IEC 61850 | D. Tholomier (FR) | 2006 - 2008 |
| WG B5-37 | Protection, control and monitoring of Shunt Reactors | P. Naisani (CA) | 2006 - 200? |
| WG B5/D2-30: | Communications for HV Substation Protection & Wide Area Protection Applications | C. Samitier (ES) | |
| JWG B5/B4.25 | Impact of HVDC Stations on Protection of AC Systems | Xi-cai Zhao | |
| WG B5.39 | Documentation requirements from design to operation to maintenance for Digital Substation Automation Systems | Rodney Hughes (AU) | |
| WG B5.40 | Education, Qualification and Continuing Professional Development of Engineers in Protection and Control | Mladen Kesunovic (US) | |
| WG B5.41 | Investigation of possibilities to improve metering systems for billing purposes in substations | Harrie Lenting (NL) | |